73% of the interior walls in a 15,000 SF clinic were preconstructed that included framing, backing, electrical, plumbing, and one-sided drywall. Project completed 2 weeks early.

73% of the interior walls in a 15,000 SF clinic were preconstructed that included framing, backing, electrical, plumbing, and one-sided drywall. Project completed 2 weeks early.