Roughly 1000 panels with 30 different sizes, Design started 14 months prior to fabrication, Panel construction started 1 month before first panel was flown, set a floor a week (20 panels per shift), did not have to rebuild a single panel

Roughly 1000 panels with 30 different sizes, Design started 14 months prior to fabrication, Panel construction started 1 month before first panel was flown, set a floor a week (20 panels per shift), did not have to rebuild a single panel